Logo image
Minimizing the Total Completion Time for the TFT-Array Factory Scheduling Problem (TAFSP)
圖書章節   同儕審查

Minimizing the Total Completion Time for the TFT-Array Factory Scheduling Problem (TAFSP)

A. H. I. Lee, S. H. Chung 和 C. Y. Huang
Computational Science and Its Applications – ICCSA 2007, 頁碼.767-778
Lecture Notes in Computer Science, Springer Berlin Heidelberg
2007

摘要

Completion Time Process Window Product Type Schedule Problem Total Completion Time
In this paper, we address and solve the scheduling problem for thin film transistor array (TFT-array) factories. The TAFSP is a variation of parallel machine scheduling problem, which involves the characteristics of process window constraint, machine dedication constraint, mask availability constraint, and mask setup and transportation activities. Hence, we propose an integer programming formulation to solve the TAFSP. To increase the applicability of the integer programming model in real environment, depth-search strategy incorporates with the strong branching rule is adopted to increase the solving efficiency. Computational results show that a good-quality feasible solution can be obtained in an acceptable computational time for a real-world case.

相關連結

指標

1 檢視次數

詳細資料

Logo image