Abstract
This study aims to develop a methodology for predicting cycle time based on domain knowledge and data mining algorithms given production status including WIP, throughput. The proposed model and derived rules were validated with real data and demonstrated its practical viability for supporting production planning decisions. © 2005 IEEE.