摘要

Blackout Companies Electricity electricity rationing Liquefied natural gas Load shedding outage Power generation Power supplies restoration Reviews Risk analysis Standards Training under-frequency load shedding
This paper examines the blackout that occurred in Taiwan power system on August 15, 2017 (the 815 Blackout). The blackout was caused by an interruption of the liquefied natural gas (LNG) supply from the Taiwan Chinese Petroleum Company (CPC). The interruption resulted in a loss of 4.16 GW of generation, or 11.94% of the total power supply in Taiwan. Under-frequency load shedding (UFLS) scheme was activated to shed loads and undergo the impact of sudden generation loss. To restore the power system, the Taiwan power company (TPC) carried out electricity rationing for nearly five hours. The consequences of the blackout were damages exceeding US3 million, impacted over 400 companies, and left 5.92 million households without power. This paper examines the root causes of the 815 blackout, the consequences, and the restoration process. Countermeasures taken for the future power system operation are also recommended.

相關連結

指標

1 檢視次數

詳細資料

Logo image