Project management model for constructing a renewable energy plant
會議論文集   同儕審查

Project management model for constructing a renewable energy plant

Amy H. I. Lee, He-Yau Kang 和 Tzu-Ting Huang
Procedia engineering, 卷.174, 頁碼.145-154
Procedia Engineering
01/01/2017
Web of Science ID: WOS:000399998200017

摘要

Engineering Engineering, Manufacturing Engineering, Multidisciplinary Science & Technology Technology
A project management model is developed for constructing a renewable energy plant in this research. Program evaluation and review technique (PERT) is applied first to find the critical activities when constructing the plant and to calculate the total project cost and total duration time for the project under normal condition. When some activities are crashed, the total duration time can be reduced. The total project cost and the total duration time for crashing various activities are calculated. The fuzzy PERT model is developed by the fuzzy multiple objective linear programming, and the model can devise the project implementation plan to maximize the total degree of satisfaction while minimizing total project cost and total duration time. A case study of a wind turbine construction in Taiwan is presented to show the practicality of the proposed models. (C) 2017 The Authors. Published by Elsevier Ltd.

檔案與連結 (1)

url
https://doi.org/10.1016/j.proeng.2017.01.186檢視
已出版(紀錄版本) 開放

相關連結

詳細資料

Logo image