Logo image
Multiple resource type scheduling problems with sequence dependent setup and un-setup times
Thesis

Multiple resource type scheduling problems with sequence dependent setup and un-setup times

Huang, Ching-Han.
Masters, 國立清華大學, 工業工程與工程管理學系所
2017

Abstract

生產排程 生產規劃 多資源限制排程規劃 順序相依整備時間 生產時窗 機台可用性 混整數規劃 production scheduling multiple resource constrained production scheduling sequence dependent setup time machine eligibility time window mixed integer programming
abstract hide

Metrics

1 Record Views

Details

Logo image