Skip to content
Back
Thesis
Multiple resource type scheduling problems with sequence dependent setup and un-setup times
Huang, Ching-Han.
Masters, 國立清華大學, 工業工程與工程管理學系所
2017
Share
Export
Abstract
Related links
Metrics
Details
Abstract
生產排程
生產規劃
多資源限制排程規劃
順序相依整備時間
生產時窗
機台可用性
混整數規劃
production scheduling
multiple resource constrained production scheduling
sequence dependent setup time
machine eligibility
time window
mixed integer programming
abstract hide
Related links
Metrics
1
Record Views
Details
Title
Multiple resource type scheduling problems with sequence dependent setup and un-setup times
Translated title
Multiple resource type scheduling problems with sequence dependent setup and un-setup times
Creators
Huang, Ching-Han.
Contributors
HUNG, YI-FENG (Advisor)
Awarding Institution
國立清華大學, 工業工程與工程管理學系所; Masters
Theses and Dissertations
Masters, 國立清華大學, 工業工程與工程管理學系所
Language
English
Resource Type
Thesis
Date published
2018
Show the rest
Details