Logo image
核四廠RELAP5/MOD3輸入數據建立與暫態事故分析
Thesis

核四廠RELAP5/MOD3輸入數據建立與暫態事故分析

劉紹楷
Masters, 國立清華大學, 工程與系統科學系
2007

Abstract

核四廠 進步型沸水式電廠 RELAP5/MOD3 龍門電廠 ABWR RELAP5/MOD3 Advanced Boiling Water Reactor Lungmen
In this study, a reactor system thermohydraulic system analysis code, RELAP5/MOD3 is used to analyzed selected transients in the Final safety analysis report (FSAR) of Lungmen Nuclear Power Stations (NPS).The plant employs two general electric designed Advanced Boiling Water Reactor (ABWR) with rated power of 1350MWe. The Lungmen input deck of RELAP5/MOD3, models reactor pressure vessel (RPV) and banlance of plant (BOP), which includes major components such as turbines, heat ecxhangers, reheaters, and pumps. The input deck has been successfully initialize to a steady state condition. The internal pump trip and main steam line isolation valves closures transients in FSAR of Lungmen NPS are simulated. The results are compared with the data in FSAR. The comparsion of the simulated results with the results shown in FSAR are not satisfactory due to lack of modeling of the control system in the input deck.

Metrics

1 Record Views

Details

Logo image