Abstract
An alternative formulation of the scheduling problem in a robot-centered manufacturing cell has been described here, which was originally formulated by Lin et al. [7] as a mixed integer programming problem. An efficient procedure based on the branch and bound technique has been proposed. In order to reduce the complexity of the branching procedure, several sequencing rules [4] have been imbedded into the proposed procedure and an integrated algorithm has then been presented. The computational results have indicated the proposed algorithm to be efficient. Finally, conclusions and some suggestions are given. © 1993 Taylor & Francis Group, LLC.