Logo image
A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations
期刊文章   開放取用(OA)   同儕審查

A production planning methodology for semiconductor manufacturing based on iterative simulation and linear programming calculations

Yi-Feng HungRobert C. Leachman
IEEE Transactions on Semiconductor Manufacturing, 卷.9(2), 頁碼.257-269
1996

摘要

Electronic Optical and Magnetic Materials Condensed Matter Physics Industrial and Manufacturing Engineering Electrical and Electronic Engineering
We introduce a methodology for automated production planning of semiconductor manufacturing based on iterative linear programming (LP) optimization and discrete-event simulation calculations. The LP formulation incorporates epochdependent parameters for flow times from lot release up to each operation on each manufacturing route. LP-derived release schedules are used as input to the simulation model, from which statistics on flow times are collected and used to reformulate the LP model for a revised planning calculation. Iteration continues until satisfactory agreement between simulation and LP models is obtained. We demonstrate in experiments on an industry data set that a relatively small number of iterations is required to develop a production plan correctly characterizing future flow times as a function of factory load and product mix. The methodology makes possible automated production planning of semiconductor manufacturing on an engineering work station. © 1996 IEEE.

檔案與連結 (1)

pdf
A Production_planning_methodology_for_semiconductor_manufacturing_based_on_iterative_simulation_and_linear_programming_calculations.pdf下載檢視
開放存取(OA)

相關連結

指標

1 檢視次數

詳細資料

Logo image