Logo image
Disassembly Sequencing Problems with Stochastic Processing Time using Simplified Swarm Optimization
期刊文章   同儕審查

Disassembly Sequencing Problems with Stochastic Processing Time using Simplified Swarm Optimization

Wei-Chang Yeh, Chen-Min Lin 和 Shang-Chia Wei
International journal of innovation, management and technology, 卷.3(3), 頁碼.226-231
01/06/2012

摘要

Digital signal processing Disassembly Dismantling Mathematical analysis Optimization Reclamation Sequencing Stochasticity
With eco-awareness and eco-regulation, the end of-life (EOL) disassembly sequencing problem (DSP) has become increasingly important in the process of recycling, reclamation, or remanufacturing EOL products. However, most of the studies in the disassembly sequencing plan assume that the processing time is deterministic for each part's disassembling procedure. For a realistic and logical approach to the DSP, we take account of the stochastic concept and redefine each part's disassembling time as an exponentially distributed function. Considering the NP-complete nature of the stochastic problem, this paper presents a revised simplified swarm optimization (SSO) to minimize the total expected disassembling time for the stochastic disassembly sequencing problem (SDSP). The results presented in the study show that the SSO is qualified to effectively schedule the SDSP under limited computation time.

相關連結

指標

1 檢視次數

詳細資料

Logo image