Infinite capacity planning for IC packaging plants
期刊文章   同儕審查

Infinite capacity planning for IC packaging plants

James C. Chen, Ling-Huey Su, Cheng-Ju SunMei-Fang Hsu
International Journal of Production Research, 卷.48(19), 頁碼.5729-5748
10/2010

摘要

capability capacity planning IC packaging Industrial and Manufacturing Engineering Management Science and Operations Research Strategy and Management
An infinite capacity planning system (ICPS) considering the capacity and capability of machines as well as the capacity of jigs is developed for an integrated circuit packaging plant. ICPS consists of five modules: work-in-process (WIP) pulling module, lot release module, resource selection module, workload accumulation module, and workload balance module. The WIP-pulling module pulls WIP from the end of the process route to meet the master production schedule (MPS). If WIP cannot meet the MPS requirement, the lot release module is executed to release new lots. The resource selection module helps a lot to select an appropriate resource, by taking into account the resource's capacity and capability, at each operation step and calculate the lot's planned start time and planned finished time at each step. The workload accumulation module accumulates the workload of each machine and each jig on each day. The workload balance module balances the loading of machines and jigs by adjusting the lot's start time using these resources. Simulation is used to evaluate ICPS performance, and results show that ICPS can effectively and efficiently balance the workload of production resources: machines and jigs. © 2010 Taylor & Francis.

相關連結

指標

1 檢視次數

詳細資料

Logo image