Logo image
Multi-resource constrained scheduling considering process plan flexibility and lot streaming for the CNC machining industry
期刊文章   同儕審查

Multi-resource constrained scheduling considering process plan flexibility and lot streaming for the CNC machining industry

James C. Chen, Tzu-Li Chen, Yin-Yann ChenMin-Yu Chung
Flexible Services and Manufacturing Journal, 卷.36(3), 頁碼.946-993
2024

摘要

Flexible job shop scheduling;Lot streaming;Multi-objective scheduling problem;Multiple resource constraints Management Science and Operations Research Industrial and Manufacturing Engineering

The CNC machining scheduling problem is a classic flexible job shop scheduling problem (FJSSP) that has been proven to be NP-hard. Although there has been extensive research on FJSSP, its applications in real-world CNC machining scheduling problems have received limited attention, with few related papers. In reality, several critical characteristics within the CNC machining industry can significantly impact the scheduling problem, such as process plan flexibility, multiple resource constraints, and lot streaming. This study aims to establish a scheduling system for the CNC machining industry that integrates order information, work in process information, and the aforementioned characteristics, using a hybrid multi-objective genetic algorithm (HMOGA) combined with local search. The optimal parameter combination for HMOGA is determined through a design of experiments, while the effectiveness of local search is evaluated using computational analysis. Finally, real data from a company is used to validate the proposed method. The results demonstrate that the scheduling system developed in this study effectively addresses real-world CNC machining scheduling problems.

相關連結

指標

1 檢視次數

詳細資料

Logo image