Logo image
The evaluation of search range assignment in 300 mm automated material handling system (AMHS)
Journal article   Peer reviewed

The evaluation of search range assignment in 300 mm automated material handling system (AMHS)

D.Y. Sha, J.T. Lin and C.J. Yang
International Journal of Advanced Manufacturing Technology, Vol.35(7-8), pp.697-710
01/2008

Abstract

AMHS Dispatching Search range Simulation
In the 300 mm AMHS with a connected loops layout, the vehicle can travel not just in one loop but all around the wide fab to execute tool-to-tool delivery. Determining how far the waiting FOUPs (WFs) or idle vehicles (IVs) should be considered before selecting a dispatching rule might make dispatching more efficient. A two-phase approach with simulation has been developed to assign the search range (SR) for studying this idea. The model of a simplified 300 mm AMHS was built using eM-Plant and Design Expert to design experiments and analyse the results. In phase I, the number of WF and IV in the system at the time of dispatching will affect the distance of the vehicle's empty trip (DVemp). Further, the SR was assigned and evaluated based on the average and standard deviation of DVemp under different numbers of WF and IV in phase II. The results indicated that the SR significantly affects the performance, and a longer SR used in a light system is feasible; a shorter SR is applicable for a heavy system. © 2006 Springer-Verlag London Limited.

Metrics

1 Record Views

Details

Logo image