Logo image
A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtime
Other   Peer reviewed

A branch-and-bound algorithm for the three-machine flowshop scheduling problem with bicriteria of makespan andtotal flowtime

Wei-Chang Yeh and Ali Allahverdi
International Transactions in Operational Research, Vol.11(3), pp.323-339
2004

Abstract

Bicriteria Dominance relation Flowshop Flowtime Heuristics Makespan Business and International Management Computer Science Applications Strategy and Management Management Science and Operations Research Management of Technology and Innovation
This paper addresses the three-machine flowshop scheduling problem with a bicriteria of minimizing a weighted sum of makespan and total flowtime. Three lower bounds, an upper bound, and several dominance relations are developed. The upper bound is developed using a two-phase hybrid heuristic method. A branch-and-bound algorithm, incorporating the developed bounds and dominance relations, is presented. An extensive computational analysis on randomly generated problems is conducted. The analysis indicates that the proposed bounds, dominance relations, and branch-and-bound algorithm are efficient. © 2004 Wiley Periodicals, Inc.

Metrics

1 Record Views

Details

Logo image